Wiki » History » Version 62

piat, charles ugo, 03/18/2015 07:05 PM

1 58 piat, charles ugo
h1. Design and integration of a Ka-band terminal for on-the-field communication and measurements
2 58 piat, charles ugo
3 60 piat, charles ugo
!"system_complet.jpg"!
4 58 piat, charles ugo
5 58 piat, charles ugo
6 19 piat, charles ugo
h1. Problem positioning
7 3 VEILLARD GAROZ, Loïc
8 17 piat, charles ugo
The satcom lab of Télécom Bretagne will soon be equipped with a TooWay/KA SAT facilities (bi-directional internet via satellite) that come in two flavours: a fixed antenna for access within the lab and a fly away antenna for on-the field access. On-the-field access is provided through a transportable terminal (see pictures below). The transportable terminal integrates a modem, networking facilities and end-devices (e.g., DECT/VOIP phones).
9 1 VEILLARD GAROZ, Loïc
10 17 piat, charles ugo
The objective of this project is to design and integrate the portable terminal taking into account all aspects: communication, networking and physical integration.
11 1 VEILLARD GAROZ, Loïc
12 19 piat, charles ugo
h1. Introduction
13 20 piat, charles ugo
14 45 piat, charles ugo
The transportable terminal provides services in inhospitable and isolated locations. In particular, our aim consists in bringing internet access through wired and WiFi IP network and to provide internal and external VoIP calls. The terminal is composed of two antennas (one fixe and another one mobile) and a modem to receive the signal from the Ka-Sat satellite and convert it into digital signal. One router, a Dect and some IP phones constitute the second part of the terminal to share the network between the internet access and the phone calls. In the first part of the project, we have identified the use cases and the corresponding network architecture (address and routing plan). Then we proceed with the integration of the networking and communication components in a ruggedized flight case. Later we have connected the transportable terminal to the fixe antenna to realize some tests and demonstrations of the overall system. The terminal is transportable with its mobile antenna and could be used during important and catastrophic events by the red cross for instance to keep them in touch with the head quarter.
15 1 VEILLARD GAROZ, Loïc
16 62 piat, charles ugo
The following is:
17 62 piat, charles ugo
  * A list
18 62 piat, charles ugo
  * Of bulleted items
19 62 piat, charles ugo
    # This is a numbered sublist
20 62 piat, charles ugo
    # Which is done by indenting further
21 62 piat, charles ugo
  * And back to the main bulleted list
22 62 piat, charles ugo
23 62 piat, charles ugo
 * This is also a list
24 62 piat, charles ugo
 * With a single leading space
25 62 piat, charles ugo
 * Notice that it is rendered
26 62 piat, charles ugo
  # At the same levels
27 62 piat, charles ugo
  # As the above lists.
28 62 piat, charles ugo
 * Despite the different indentation levels.
29 59 piat, charles ugo
30 59 piat, charles ugo
31 19 piat, charles ugo
h1. Content
32 20 piat, charles ugo
33 52 piat, charles ugo
h2. I. Design of the Ka-Sat Terminal
34 20 piat, charles ugo
35 49 piat, charles ugo
h3. [[a. Study of User Cases]]
36 20 piat, charles ugo
37 49 piat, charles ugo
h3. [[b. Design of the Network Architecture]]
38 20 piat, charles ugo
39 49 piat, charles ugo
h3. [[c. Description of the Components]] 
40 20 piat, charles ugo
41 53 piat, charles ugo
h2. II. Networking and Communication between components
42 20 piat, charles ugo
43 50 piat, charles ugo
h3. [[a. Networking of components]]
44 20 piat, charles ugo
45 50 piat, charles ugo
h3. [[b. Establishment of the VoIP link]] 
46 20 piat, charles ugo
47 50 piat, charles ugo
h3. [[c. Quality of Service and Firewall]]
48 20 piat, charles ugo
49 54 piat, charles ugo
h2. III. Integration on the Ka-Sat Terminal
50 20 piat, charles ugo
51 51 piat, charles ugo
h3. [[a. Mounting of the components on the ruggedized flight case]]
52 20 piat, charles ugo
53 51 piat, charles ugo
h3. [[b. User Manual]]
54 11 VEILLARD GAROZ, Loïc
55 57 piat, charles ugo
h2. IV. Results and performance
56 42 VEILLARD GAROZ, Loïc
57 56 piat, charles ugo
h3. [[a. Network analysis]]
58 42 VEILLARD GAROZ, Loïc
59 56 piat, charles ugo
h3. [[b. Rain conditions]]
60 1 VEILLARD GAROZ, Loïc
61 56 piat, charles ugo
h3. [[c. Upgradeability]]
62 43 VEILLARD GAROZ, Loïc
63 55 piat, charles ugo
h2. V. Media
64 55 piat, charles ugo
65 55 piat, charles ugo
h3. [[a. Installation of the antenna]]
66 55 piat, charles ugo
67 55 piat, charles ugo
h3. [[b. Establishment of the satellite link]]
68 55 piat, charles ugo
69 47 piat, charles ugo
h1. Authors
70 46 piat, charles ugo
71 46 piat, charles ugo
Charles-Ugo PIAT
72 46 piat, charles ugo
Loïc Veillard
73 46 piat, charles ugo
74 47 piat, charles ugo
h1. Supervisor
75 46 piat, charles ugo
76 46 piat, charles ugo
Laurent FRANCK, responsible for the Toulouse site of Télécom Bretagne.