Wiki » History » Version 70

piat, charles ugo, 03/18/2015 07:14 PM

1 58 piat, charles ugo
h1. Design and integration of a Ka-band terminal for on-the-field communication and measurements
2 58 piat, charles ugo
3 60 piat, charles ugo
!"system_complet.jpg"!
4 58 piat, charles ugo
5 58 piat, charles ugo
6 19 piat, charles ugo
h1. Problem positioning
7 3 VEILLARD GAROZ, Loïc
8 17 piat, charles ugo
The satcom lab of Télécom Bretagne will soon be equipped with a TooWay/KA SAT facilities (bi-directional internet via satellite) that come in two flavours: a fixed antenna for access within the lab and a fly away antenna for on-the field access. On-the-field access is provided through a transportable terminal (see pictures below). The transportable terminal integrates a modem, networking facilities and end-devices (e.g., DECT/VOIP phones).
9 1 VEILLARD GAROZ, Loïc
10 17 piat, charles ugo
The objective of this project is to design and integrate the portable terminal taking into account all aspects: communication, networking and physical integration.
11 1 VEILLARD GAROZ, Loïc
12 19 piat, charles ugo
h1. Introduction
13 20 piat, charles ugo
14 45 piat, charles ugo
The transportable terminal provides services in inhospitable and isolated locations. In particular, our aim consists in bringing internet access through wired and WiFi IP network and to provide internal and external VoIP calls. The terminal is composed of two antennas (one fixe and another one mobile) and a modem to receive the signal from the Ka-Sat satellite and convert it into digital signal. One router, a Dect and some IP phones constitute the second part of the terminal to share the network between the internet access and the phone calls. In the first part of the project, we have identified the use cases and the corresponding network architecture (address and routing plan). Then we proceed with the integration of the networking and communication components in a ruggedized flight case. Later we have connected the transportable terminal to the fixe antenna to realize some tests and demonstrations of the overall system. The terminal is transportable with its mobile antenna and could be used during important and catastrophic events by the red cross for instance to keep them in touch with the head quarter.
15 1 VEILLARD GAROZ, Loïc
16 63 piat, charles ugo
17 62 piat, charles ugo
h1. Content
18 62 piat, charles ugo
19 67 piat, charles ugo
 * Design of the Ka-Sat Terminal
20 69 piat, charles ugo
  # [[a. Study of User Cases]]
21 69 piat, charles ugo
  * [[b. Design of the Network Architecture]]
22 69 piat, charles ugo
  * [[c. Description of the Components]] 
23 20 piat, charles ugo
24 70 piat, charles ugo
* This is also a list
25 70 piat, charles ugo
 * With a single leading space
26 70 piat, charles ugo
 * Notice that it is rendered
27 70 piat, charles ugo
  # At the same levels
28 70 piat, charles ugo
  # As the above lists.
29 70 piat, charles ugo
 * Despite the different indentation levels.
30 70 piat, charles ugo
31 53 piat, charles ugo
h2. II. Networking and Communication between components
32 20 piat, charles ugo
33 50 piat, charles ugo
h3. [[a. Networking of components]]
34 20 piat, charles ugo
35 50 piat, charles ugo
h3. [[b. Establishment of the VoIP link]] 
36 20 piat, charles ugo
37 50 piat, charles ugo
h3. [[c. Quality of Service and Firewall]]
38 20 piat, charles ugo
39 54 piat, charles ugo
h2. III. Integration on the Ka-Sat Terminal
40 20 piat, charles ugo
41 51 piat, charles ugo
h3. [[a. Mounting of the components on the ruggedized flight case]]
42 20 piat, charles ugo
43 51 piat, charles ugo
h3. [[b. User Manual]]
44 11 VEILLARD GAROZ, Loïc
45 57 piat, charles ugo
h2. IV. Results and performance
46 42 VEILLARD GAROZ, Loïc
47 56 piat, charles ugo
h3. [[a. Network analysis]]
48 42 VEILLARD GAROZ, Loïc
49 56 piat, charles ugo
h3. [[b. Rain conditions]]
50 1 VEILLARD GAROZ, Loïc
51 56 piat, charles ugo
h3. [[c. Upgradeability]]
52 43 VEILLARD GAROZ, Loïc
53 55 piat, charles ugo
h2. V. Media
54 55 piat, charles ugo
55 55 piat, charles ugo
h3. [[a. Installation of the antenna]]
56 55 piat, charles ugo
57 55 piat, charles ugo
h3. [[b. Establishment of the satellite link]]
58 55 piat, charles ugo
59 47 piat, charles ugo
h1. Authors
60 46 piat, charles ugo
61 46 piat, charles ugo
Charles-Ugo PIAT
62 46 piat, charles ugo
Loïc Veillard
63 46 piat, charles ugo
64 47 piat, charles ugo
h1. Supervisor
65 46 piat, charles ugo
66 46 piat, charles ugo
Laurent FRANCK, responsible for the Toulouse site of Télécom Bretagne.