Implementation » History » Version 12

SERRA FONT, Anna, 03/17/2015 04:45 PM

1 1 RIBAS MACHADO, Ederson
h1. Implementation
2 1 RIBAS MACHADO, Ederson
3 11 SERRA FONT, Anna
At this point we were familiar with the system analyse of a link budget, knowledge acquired throughout the different subjects imparted in the master course and especially thanks to the realisation of the project 2 (_Design of a regional multi-beam satellite system_), that has an strong bond with the present project.
4 1 RIBAS MACHADO, Ederson
5 11 SERRA FONT, Anna
h2. Diagram block of application development
6 11 SERRA FONT, Anna
7 11 SERRA FONT, Anna
The diagram below shows the planning with the different phases we have designed in order to perform the successful and coherent development of the tool.
8 11 SERRA FONT, Anna
9 1 RIBAS MACHADO, Ederson
p=. !{width: 70%}figure4.jpg!
10 1 RIBAS MACHADO, Ederson
11 12 SERRA FONT, Anna
In short, the first steps were to decide what would be the basic structure of our link budget program and identify all the parameters and possible calculations, as well as the logical place to perform them in this structure. Thus, a preliminary design with the fundamental and simplest conditions would be performed, to then add gradually other features in order to improve its capabilities. Finally, verification of results and testing with subjects would be done in order to finish the complete design of the tool. These steps are further explained below.
12 9 RIBAS MACHADO, Ederson
13 11 SERRA FONT, Anna
link budget es muy complejo --> desglosar e ir por etapas
14 11 SERRA FONT, Anna
The idea was to at first design the main link budget.
15 1 RIBAS MACHADO, Ederson
16 5 SERRA FONT, Anna
17 11 SERRA FONT, Anna
h2. Overview Application Plan
18 1 RIBAS MACHADO, Ederson
19 11 SERRA FONT, Anna
In order to design a tool to help the comprehension in Link Budget analysis, firstly it is necessary to identify the topology of the satellite system communication and divide it in block groups. The division was made taking into account the path of the signal and the equipment, as well as the service provide. The divisions are: Geometry System, uplink, payload, downlink, service & overall link.
20 11 SERRA FONT, Anna
Looking for a good way to show the groups we've decided to show ¿...?¿? {TODO}
21 5 SERRA FONT, Anna
22 1 RIBAS MACHADO, Ederson
23 5 SERRA FONT, Anna
24 5 SERRA FONT, Anna
25 11 SERRA FONT, Anna
26 11 SERRA FONT, Anna
Just a little introduction: we have distributed our tool in 6 tabs: Geometry System, uplink, payload, downlink, service & overall link
27 11 SERRA FONT, Anna
In the following pictures we present a first implementation (they are sketches) for the tabs: