h1. Implementation
2 1 RIBAS MACHADO, Ederson
3 11 SERRA FONT, Anna
At this point we were familiar with the system analyse of a link budget, knowledge acquired throughout the different subjects imparted in the master course and especially thanks to the realisation of the project 2 (_Design of a regional multi-beam satellite system_), that has an strong bond with the present project.
4 1 RIBAS MACHADO, Ederson
5 11 SERRA FONT, Anna
h2. Diagram block of application development
6 11 SERRA FONT, Anna
7 11 SERRA FONT, Anna
The diagram below shows the planning with the different phases we have designed in order to perform the successful and coherent development of the tool.
8 11 SERRA FONT, Anna
9 1 RIBAS MACHADO, Ederson
p=. !{width: 70%}figure4.jpg!
10 1 RIBAS MACHADO, Ederson
11 13 SERRA FONT, Anna
In short, the first steps were to decide what would be the basic structure of our link budget program and identify all the parameters and possible calculations, as well as the logical place to perform them in this structure. Thus, a preliminary design with the fundamental and simplest conditions has been performed, to then add gradually other features in order to improve its capabilities. Finally, verification of results and testing with subjects has been done in order to finish the complete design of the tool. These steps are further explained below.
12 1 RIBAS MACHADO, Ederson
13 13 SERRA FONT, Anna
14 13 SERRA FONT, Anna
It is known that link budget equations can become messy and complex and this calculus involve several aspects and conditions, furthermore, link budget can be analysed from different points of view. Globally, it can be defined with the following approaches:
15 13 SERRA FONT, Anna
* The first approach is a feasibility study: The user gives the features of the system, the targeted service, the bit rate, the bit error rate, etc., and the link budget says either if it is possible with this margin or if this is not possible (negative margin).
16 13 SERRA FONT, Anna
17 13 SERRA FONT, Anna
* In the second approach the user also defines the features of the system, and then the link budget says what is possible to do in terms of bit rate, bit error rate, etc.
18 13 SERRA FONT, Anna
19 13 SERRA FONT, Anna
* Finally there is a third approach where the user says which is the service he would like to have, and the link budget tool finds all the system settings. But this approach is much more complex, because as there are several parameters to define, it turns into a lot of different configuration options.
20 13 SERRA FONT, Anna
21 13 SERRA FONT, Anna
22 11 SERRA FONT, Anna
link budget es muy complejo --> desglosar e ir por etapas
23 1 RIBAS MACHADO, Ederson
The idea was to at first design the main link budget.
24 5 SERRA FONT, Anna
25 11 SERRA FONT, Anna
26 1 RIBAS MACHADO, Ederson
h2. Overview Application Plan
27 1 RIBAS MACHADO, Ederson
28 13 SERRA FONT, Anna
In order to design a tool to help with the comprehension of the link budget analysis, firstly it is necessary to identify the topology of the satellite communication system and divide it in block groups.
29 13 SERRA FONT, Anna
30 13 SERRA FONT, Anna
The division was made taking into account the path of the signal and the equipment, as well as the service provide. The divisions are: Geometry System, uplink, payload, downlink, service & overall link.
31 11 SERRA FONT, Anna
Looking for a good way to show the groups we've decided to show ¿...?¿? {TODO}
32 5 SERRA FONT, Anna
33 1 RIBAS MACHADO, Ederson
34 5 SERRA FONT, Anna
35 5 SERRA FONT, Anna
36 11 SERRA FONT, Anna
37 11 SERRA FONT, Anna
Just a little introduction: we have distributed our tool in 6 tabs: Geometry System, uplink, payload, downlink, service & overall link
38 11 SERRA FONT, Anna
In the following pictures we present a first implementation (they are sketches) for the tabs: