Implementation » History » Version 9

Version 8 (RIBAS MACHADO, Ederson , 02/05/2015 05:30 AM) → Version 9/74 (RIBAS MACHADO, Ederson , 02/05/2015 01:59 PM)

h1. Implementation



h2. Bloc diagrams of application development

p=. !{width: 70%}figure4.jpg!

{<EXPERIMENTAL}

These section and figures will be explained...
h2.Overview Application Plan

In order to design a tool to help the comprehension in Link Budget analysis, firstly it is necessary identify the topology of the satellite system communication and divise in block groups. The division was made taking in account the path of the signal and the equipment, as well as the service provide. The divisions are: Geometry System, uplink, payload, downlink, service & overall link
Looking for a good way to show the groups we've decided to show

p=. !{width: 70%}figure.jpg!


Just a little introduction: we have distributed our tool in 6 tabs: Geometry System, uplink, payload, downlink, service & overall link
In the following pictures we present a first implementation (they are sketches) for the tabs:

Geometry system tab:

!Figure2.jpg!

Uplink tab:

!Figure3.jpg!