Frequency bands adapted to this project » History » Version 6

AUGER, Anne sophie, 03/23/2015 02:12 PM

1 1 AUGER, Anne sophie
h1. Frequency bands adapted to this project
2 1 AUGER, Anne sophie
3 2 AUGER, Anne sophie
* *License-free band* 
4 2 AUGER, Anne sophie
5 2 AUGER, Anne sophie
6 5 AUGER, Anne sophie
For the design of radio systems of small range and low emission power, the Annex 7 of the TNRBF specifies bands with no license requiered to transmit. They are a simple solution to the frequency research, and there is no need to request a frequency band to the ANFR. In particular, the section for non-specific equipment is particularly adapted for TM/TC activities, data and video transmission (c.f. [[ANNEX I]] ). 
7 1 AUGER, Anne sophie
8 1 AUGER, Anne sophie
Considering the high range required for the link (minimum 50km), there are two suitable bands with different characteristics:
9 1 AUGER, Anne sophie
10 1 AUGER, Anne sophie
* 868,7-869,2 MHz offers a 500 kHz bandwidth and ERP=25 mW leading to EIRP=41 mW
11 1 AUGER, Anne sophie
* 869,4-869,65 MHz offers a 250 kHz bandwidth and ERP=500 mW leading to EIRP=820 mW 
12 1 AUGER, Anne sophie
13 1 AUGER, Anne sophie
With
14 1 AUGER, Anne sophie
15 1 AUGER, Anne sophie
bq. ERP: effective radiated power (ERP), often used to describe low frequencies systems.
16 1 AUGER, Anne sophie
EIRP: effective isotropic radiated power (EIRP), often used to describe high frequencies systems.
17 1 AUGER, Anne sophie
18 1 AUGER, Anne sophie
And 
19 1 AUGER, Anne sophie
20 1 AUGER, Anne sophie
p=. *EIRP=ERP ×1,64*
21 1 AUGER, Anne sophie
22 1 AUGER, Anne sophie
23 4 AUGER, Anne sophie
Considering our long range application, the 500 mW ERP band seems to be better adapted, but there is a trade off to make with the bandwidth available, especially for the video transmission that requires large bandwidth.
24 1 AUGER, Anne sophie
25 1 AUGER, Anne sophie
p=. !868.png!
26 1 AUGER, Anne sophie
27 1 AUGER, Anne sophie
28 4 AUGER, Anne sophie
Although it appears to be the fastest and easiest way to define the frequency range of a system, the use of a free band is risky for the user. Indeed, there are no guaranties of non-jamming for users of license-free radio systems. In our case, a permanent link should be maintained between the aircraft and the ground station, considering that the aircraft will fly around the city of Toulouse and transmit uniformly to a region of more than 100 km all around its antenna. We need a license to perform such emission from the aircraft on the city of Toulouse: the solution is to send a frequency allocation request to the ANFR.
29 2 AUGER, Anne sophie
30 2 AUGER, Anne sophie
31 2 AUGER, Anne sophie
* *License band*
32 2 AUGER, Anne sophie
33 4 AUGER, Anne sophie
The process of frequency allocation is long and administratively complex, that’s why we asked for information at an early stage of the project. 
34 1 AUGER, Anne sophie
35 4 AUGER, Anne sophie
As we said before, the RF spectrum is shared among services and users. Our application being a air/ground link, we began to search for frequency bands dedicated to the service named MBA (Mobile for Aeronautical services) and affected to the user DEF (Ministry of Defence), because ISAE is under the tuition of Defence Ministry. There, it appears that the  5091-5150 MHz band should fit our application (c.f. [[ANNEX II]] ).
36 2 AUGER, Anne sophie
37 4 AUGER, Anne sophie
If the ANFR accepts our request, it will provide specify the sub-band available for our application, and the emission power authorized for our equipment. 
38 4 AUGER, Anne sophie
39 2 AUGER, Anne sophie
At the end of this project, the process of the frequency band request has not succeeded yet. However, we have reached an interlocutor within the frequency office of the DGSIC, Dominique Pizzol, and the result of our discussion should come up soon.
40 2 AUGER, Anne sophie
41 2 AUGER, Anne sophie
42 2 AUGER, Anne sophie
* *Methodology for the project*
43 1 AUGER, Anne sophie
44 1 AUGER, Anne sophie
We choose to study the performance of the system design considering the two previous bands : 869,4-869,65 MHz, and 5091-5150 MHz, in order to keep doors opened and see the influence of both bands.
45 2 AUGER, Anne sophie
46 6 AUGER, Anne sophie
In order to simulate the system performance and find the required parameters, we need the EIRP and bandwidth available for our application in the 5091-5150 MHz band. According to our research in the litterature, we will fix the bandwidth to 5OO kHZ, and the EIRP to 1W.
47 4 AUGER, Anne sophie
48 4 AUGER, Anne sophie
This is a very high contraints in terms of "RF pollution", especially in a highly dense aeronautical/spatial pole such as Toulouse.