Wiki » History » Version 2
Version 1 (AUGER, Anne sophie, 03/18/2015 06:30 PM) → Version 2/55 (AUGER, Anne sophie, 03/21/2015 03:33 PM)
h1. DESIGN OF A TM/TC LINK BETWEEN SMALL AIRCRAFT AND GROUND STATION
h2. INTRODUCTION
The aim of this project is the design of a Telemetry and Command link between small aircrafts (ie TB20) and an antenna on top of ISAE building. There are different aspects in this work:
* regulatory aspects : we must pay for rights of emission on a given frequency band
* link budget aspects : some parameters can be adjusted to reach the wanted performance
* flight constraints have to be considered to allow a full time link
To summarize the system design constraints, we can fill the mission statement below:
h2. RESEARCH OF A FREQUENCY BAND
h3. Issue of a free band
SYSTEM DESIGN CONSTRAINTS AND VARIABLES
SIMULATION OF THE LINK BUDGET PERFORMANCE
h2. INTRODUCTION
The aim of this project is the design of a Telemetry and Command link between small aircrafts (ie TB20) and an antenna on top of ISAE building. There are different aspects in this work:
* regulatory aspects : we must pay for rights of emission on a given frequency band
* link budget aspects : some parameters can be adjusted to reach the wanted performance
* flight constraints have to be considered to allow a full time link
To summarize the system design constraints, we can fill the mission statement below:
h2. RESEARCH OF A FREQUENCY BAND
h3. Issue of a free band
SYSTEM DESIGN CONSTRAINTS AND VARIABLES
SIMULATION OF THE LINK BUDGET PERFORMANCE