• Sign in
  • Register
  • Home
  • Projects
  • Help
  • Issues
  • Spent time
2014 Dimensioning and budgeting of TM/TC link
All Projects

SOURCEFORGE » RALF » 2014 Dimensioning and budgeting of TM/TC link

  • Overview
  • Activity
  • issues
  • News
  • Documents
  • Wiki
  • Repository

Wiki

  • Start page
  • Index by title
  • Index by date

Index by date

03/24/2015

  • Computation of (GT)
  • Constraints and parameters for the system design
  • Constraints for antennas selection
  • Constraints for the physical layer and RF equipment
  • Evaluation of the MODCOD and (GT) required
  • Evaluation of the required EbN0
  • Influence of the Bandwidth on the EIRP
  • Influence of the distance on the bit rate
  • Introduction
  • Legislation
  • Methodology for the design
  • Modulation and coding selection
  • Simulations and results
  • Wiki

03/23/2015

  • Conclusion
  • Frequency bands adapted to this project
  • Issues encountered
  • Network architecture
  • Other design constraints and variable
  • Protocol stack consideration
  • Request for frequency allocation
  • Required bit rate
  • Research of a frequency band
  • Suggestion of equipment
  • Tasks and aim of the project

03/22/2015

  • ANNEX I
  • ANNEX II

Also available in: Atom

Loading...
Powered by Redmine - Hosted by ISAE | Theme by Abacus Themes |  We use RedmineUP plugins