• Sign in
  • Register
  • Home
  • Projects
  • Help
  • Issues
  • Spent time
2014 Dimensioning and budgeting of TM/TC link
All Projects

SOURCEFORGE » RALF » 2014 Dimensioning and budgeting of TM/TC link

  • Overview
  • Activity
  • issues
  • News
  • Documents
  • Wiki
  • Repository

Wiki

  • Start page
  • Index by title
  • Index by date

Index by title

  • Wiki
    • Computation of (GT)
    • Conclusion
    • Constraints and parameters for the system design
    • Constraints for antennas selection
    • Constraints for the physical layer and RF equipment
    • Evaluation of the MODCOD and (GT) required
    • Evaluation of the required EbN0
    • Frequency bands adapted to this project
    • Influence of the Bandwidth on the EIRP
    • Influence of the distance on the bit rate
    • Introduction
    • Issues encountered
    • Legislation
    • Methodology for the design
    • Modulation and coding selection
    • Network architecture
    • Other design constraints and variable
    • Protocol stack consideration
    • Request for frequency allocation
    • Required bit rate
    • Research of a frequency band
      • ANNEX I
      • ANNEX II
    • Simulations and results
    • Suggestion of equipment
    • Tasks and aim of the project

Also available in: Atom

Loading...
Powered by Redmine - Hosted by ISAE | Theme by Abacus Themes |  We use RedmineUP plugins